AmesimKnowledge

The Simulate menu > The Run monitor

Simulation progress bar

Simulation progress

The Simulation progress bar shows the progress of the current simulation run.

Figure 274: Simulation progress bar

The progress bar indicates the percentage of the simulation currently complete. In the screenshot above, we also see that the simulation has reached 1153.2 seconds out of a final time of 1180 seconds as configured in the Run parameters.

Note

The latter value (1180 seconds) is not the total time required to run the simulation, nor the simulation duration, but the desired termination time for the simulation.

Figure 275: Run parameters

If you are performing a batch run, a Global Simulation progress bar is displayed, as well as a Simulation progress bar for each batch:

Figure 276: Run monitor progress bars

With a batch run, if you hover your mouse cursor over the Global simulation progress bar, a popup gives you the details of the batch settings:

If you hover your mouse cursor over an individual batch run Simulation progress bar, a popup gives you the details of the settings for that particular batch:

When you perform a batch run, you can show or hide the individual Simulation progress bars by clicking the button.

Source: https://docs.sw.siemens.com/en-US/doc/254352342/PL20250521841123434.amesim_collection.Reference/Simulation_progress_bar · retrieved 2026-07-17