The Plot Manager
Working with the Plot Manager
You can open a new Plot manager for each Plot window you open.
Figure 205: Multiple plot managers
You can drag variables from the Contextual view, and the Watch and Post processing tabs into the Plot manager.
Figure 206: Dragging a variable to the Plot manager
You can drag a variable to an axis to create a new curve:
Figure 207: Dragging a variable to the Plot manager
Figure 208: The new curve
You can set separate axes, and adjust those separate axes in the Plot manager:
Figure 209: Setting separate axes in the Plot manager
Figure 210: Switching axis side in the Plot manager
Note
See Creating multiple Y-axes for more information on working with separate axes.
You can also use the Plot manager icons to perform the following operations:
| Create a separate axis for the selected curve | |
|---|---|
| Move selected curve up in the list | |
| Move selected curve down in the list | |
| Delete the selected curve | |
| Add a curve | |
| Set graph type | |
| Load data from a file | |
| Save data |